Faster Production

Fast cycle times and the absence of cure times can lead to faster production. LPO also offers multiple cavity production options. LPO reduces set up time and eliminates curing.

Compression Limiter

  • LPO phase change is between 2 seconds and 30 seconds.
  • LPO cooling times are between 15 seconds and 2 minutes.
  • Total production cycle time between 17 seconds and 150 seconds.

Typical Potting project times:

  • 10- to 30-second fill time (housing size dependent)
  • 1- to 24-hour cure time

Typical Low Pressure Overmolding project time:

  • 2- to 15-second fill time (PCB size dependent)
  • 30 seconds to 2 minutes set time